Decoding Rigging & Double‑Storey Rules for Intersec 2026

Decoding Rigging & Double‑Storey Rules for Intersec 2026

Intersec rigging regulations Dubai are already shaping stand design decisions for January 12–14, 2026. With DWTC expanding floor space to ~67,000 sqm and organisers projecting 1,400+ exhibitors, the pressure on rigging points, double‑storey approvals and floor loading is unprecedented. This guide explains the technical rules, common failures and exactly how Burdak Technical Services eliminates risk with in‑house fabrication, engineer‑ready drawings and 3D mockups.

Why Intersec 2026 Raises Rigging & Structural Stakes — Intersec rigging regulations Dubai

Intersec 2026 at Dubai World Trade Centre (DWTC) increases both scale and complexity. The enlarged footprint and attendance estimates (~50,000+ trade visitors) create intense demand for suspended AV, lighting rigs and double‑storey footprints. Key implications:

  • Hall grid pressure: DWTC primary grid spacing typically ranges from 4.5–9 m, so rigging points are finite and contested early.
  • Exhibitor density: ~1,400+ exhibitors mean more double‑storey applications and higher competition for heavy‑load zones.
  • AV and experience design: Larger visitor flows push exhibitors to add suspended screens and lighting — increasing demand for booked rigging points.

DWTC/DEC Technical Rules You Can’t Ignore — Intersec rigging regulations Dubai

DWTC/DEC technical regulations are prescriptive. Understand these limits early and incorporate them into procurement and design schedules:

  • Rigging point booking: All primary rigging points must be booked through the venue. Grid spacing and availability dictate fixture locations.
  • Point‑load limits: Standard safe working loads per point are ~500–1,000 kg. Always verify point WLL when positioning large trusses or screens.
  • Secondary safety bonds: Mandatory for all suspended loads — venue requires certified secondary attachments.
  • Floor load zones: Baseline floor capacity is commonly 2,000 kg/sqm, with designated heavy‑load zones up to ~5,000 kg/sqm. Confirm location early if heavy equipment or double‑storey decks are planned.
  • Double‑storey rules: Structural Engineer calculations, full RAMS and a refundable performance bond are required. Engineer sign‑off is non‑negotiable.
  • Deadlines: Drawings, rigging plots and RAMS are typically due 4–6 weeks before build‑up — late submissions risk rejection or forced on‑site changes.

The Most Common On‑Site Failures — Intersec rigging regulations Dubai

From our experience at DWTC shows, the failures that trigger removals, fines or AV downtime follow predictable patterns:

  • Late rigging bookings: When primary points aren’t reserved early, exhibitors are down‑graded or forced into premium third‑party rigging.
  • Incorrect load calculations: Under‑estimating live loads or dynamic loads on trusses leads to point overloads and immediate enforcement action.
  • Missing secondary safety bonds: This alone can stop rigging work until compliant bonds are fitted.
  • Inadequate floor protection: Heavy stands without specified protection damage the slab and incur fines.
  • Rushed structural paperwork: Drawings or RAMS submitted late often fail initial checks, causing costly redesigns and delays.

How Burdak Eliminates Risk — Intersec rigging regulations Dubai

We designed Burdak’s workflow to address every DWTC pain point. Our capabilities are focused on removing venue friction and avoiding premium on‑site charges:

  • In‑house fabrication & CNC joinery: Precision parts reduce on‑site assembly time and ensure tolerances meet engineered calculations.
  • Engineer‑ready structural drawings: We deliver calculations and drawings stamped for DWTC submission.
  • Full RAMS and pre‑fitted safety bonds: Submitted with drawings to meet the venue’s 4–6 week window.
  • Pre‑assembly & 3D mockups: We physically mock up double‑storey modules in our yard for client and organiser approval before shipping to site.
  • In‑house load testing: Modules are tested and certified, minimising surprises during DWTC inspections.

When to engage Burdak — step‑by‑step timeline

  • 16+ weeks before show: Engage Burdak at concept stage. We confirm feasibility versus DWTC grid and floor zones.
  • 12 weeks: Structural concept and preliminary BOM. Begin engineer calculations for double‑storey stands.
  • 8–10 weeks: Final drawings, RAMS and rigging plots prepared. We submit to DWTC in the 4–6 week window on your behalf where possible.
  • 6–4 weeks: In‑house fabrication, CNC cutting and pre‑assembly. Load tests and 3D mockup review with client.
  • 2 weeks to build: Modules packed and delivered; on‑site team performs controlled installation and secondary safety bond fitting.
  • Build days: We provide full on‑site coordination, including liaison with DWTC rigging teams.

Practical Checklist & Cost‑Avoidance Playbook — Intersec rigging regulations Dubai

Below is a pragmatic checklist and a sample cost comparison to show how integrated pre‑assembly reduces total event spend.

Pre‑event submission calendar (recommended)

  • 12–16 weeks: Concept review and feasibility with Burdak.
  • 8–10 weeks: Final structural drawings & RAMS drafted.
  • 4–6 weeks: Submit drawings, rigging plot and performance bond to DWTC.
  • 2–0 weeks: Pre‑assembly, load testing, deliver to site.

Mandatory documentation template

  • Stamped structural calculations and drawings
  • Rigging plot with point loads and WLL per point
  • Full RAMS (risk assessment & method statement)
  • Performance bond (refundable) and proof of secondary bonds
  • Floor protection and traffic management plan

6‑point on‑site readiness checklist

  • Primary rigging point confirmation from DWTC
  • Secondary safety bonds fitted and certified
  • Double‑storey engineer sign‑off paperwork on hand
  • Floor protection installed in all heavy zones
  • AV truss and screen test with power distribution verified
  • Site RAMS brief completed with all contractors

Sample cost comparison (illustrative)

  • Premium third‑party rigging (late hire): expedited rigging, crane hire and on‑site engineering coordination — approx. AED 45,000 (varies by scope).
  • Burdak integrated pre‑assembly: engineer‑ready design, in‑house load testing, pre‑fitted secondary bonds and site installation — approx. AED 28,000.
  • Estimated saving: ~35–40% on rigging and coordination when integrated at design stage (illustrative; project dependent).

FAQ — Intersec rigging regulations Dubai

  • Q: When must rigging plots and drawings be submitted?

    A: DWTC typically requires drawings, rigging plots and RAMS 4–6 weeks before build‑up. Late submissions risk rejection.

  • Q: What are typical rigging point safe working loads?

    A: Standard point WLL at DWTC is approximately 500–1,000 kg per point. Always confirm the actual WLL on your booked points.

  • Q: What is the baseline floor loading?

    A: Baseline is commonly 2,000 kg/sqm, with heavy‑load zones up to ~5,000 kg/sqm. Request heavy‑load zones early from the organiser.

  • Q: Are secondary safety bonds mandatory?

    A: Yes. DWTC requires certified secondary safety bonds for all suspended loads; failure to provide them can stop rigging work.

  • Q: How does Burdak reduce compliance risk?

    A: We supply in‑house fabrication, CNC‑cut components, engineer‑ready drawings, full RAMS and pre‑assembly 3D mockups — reducing on‑site unknowns and expensive last‑minute hires.

For Intersec 2026, the difference between a compliant, high‑impact stand and a last‑minute downgrade is early technical coordination. Contact Burdak Technical Services to lock in rigging points, prepare DWTC‑compliant drawings and schedule pre‑assembly to eliminate risk and control costs.