Exhibit insurance Dubai claims hinge on documentary and photographic evidence created before a crate leaves the factory. In the January–May UAE mega‑cycle (Middle East Energy, World Art Dubai, Arabian Travel Market, Seamless Middle East at DWTC) organisers, customs and insurers increasingly demand stamped, serial‑matched, engineer‑grade documentation — not verbal assurances. We build pre‑assembly evidence packs that make claims robust, shorten dispute timelines and reduce remediation charges.

Why exhibit insurance Dubai claims fail in UAE mega‑cycles — Common Triggers

During the DWTC/ADNEC mega‑cycle shows (7–9 Apr, 22–26 Apr, 4–7 May, 12–14 May 2026), the volume and scrutiny of submissions is at its peak. Common claim failure triggers include:

  • Customs/DG holds: Missing UN38.3, MSDS, or serial‑matched ATA Carnet entries for batteries and demo equipment result in holds or forced re‑packing.
  • Crate damage disputes: Insurers contest payouts when there is no pre‑dispatch photographic record of condition or labelled, sequenced crates.
  • Non‑compliant materials: Absent DCD fire‑rating certificates or material passports lead to on‑site remediation and bond deductions.
  • Late technical submissions: Missing engineered shop drawings or RAMS within the DWTC 3–6 week window invites surcharges and rejection.

What organisers & insurers actually look for — The documentation checklist for exhibit insurance Dubai

Organisers, official freight handlers and insurers look for a specific body of evidence. We supply each item as part of a claims‑proof pack:

  • Engineered shop drawings & RAMS: DWTC/ADNEC‑ready files (3–6 weeks pre‑build) with load calculations and method statements.
  • Certificates & COIs: Venue insurance proof, contractor COIs, and Dubai Civil Defence (DCD) fire‑rating certificates for materials.
  • Material Passports & BOMs: Component‑level materials lists and finishes with supplier traceability for DCD and insurer inspection.
  • Serial‑matched ATA Carnets / Customs paperwork: Itemised, serial‑matched entries and supporting DG paperwork (UN38.3, MSDS) for batteries and regulated equipment.
  • Pre‑dispatch photos & factory stamps: Full‑scale, high‑resolution images showing condition, serial numbers and crate labelling.

The pre‑assembly evidence pack — What to build in the factory for exhibit insurance Dubai

Pre‑assembly reduces on‑site build time by 40–60% and materially cuts rejection events. A complete evidence pack includes:

  • Full‑scale mock‑up photos: 360° images of the assembled stand in the factory, with key components labelled and serial numbers visible.
  • Bench tests & commissioning records: Video clips and pass/fail logs for electrical, mechanical and battery systems (with UN38.3 test references where applicable).
  • Bill of Materials (BOM) & shop drawings: Itemised BOM with material passports, supplier contacts and engineered joinery shop drawings (CNC output files included where relevant).
  • Labelled, sequenced crates: Numbered crate labels, handling marks and a serial‑matched packing list for each crate — compliant with "no in‑booth crate" rules and Official Freight Handler requirements.

How Burdak delivers a claims‑proof workflow — In‑House Fabrication, CNC Joinery & Mock‑Up Guarantees for exhibit insurance Dubai

We operate an integrated, UAE‑based workflow that turns the evidence checklist into verifiable deliverables. Our step‑by‑step process:

  1. Design & engineering: Produce DWTC/ADNEC‑ready engineered shop drawings and RAMS. All drawings are stamped and version‑controlled.
  2. In‑house fabrication & CNC joinery: Components are produced in our UAE workshop to tight tolerances; CNC files are archived as part of the pack.
  3. Full‑scale pre‑assembly (3D mock‑ups): We assemble stands fully in the factory, capture high‑res photos, video commissioning tests and create a material passport per component.
  4. Packing & crate sequencing: We produce serial‑matched packing lists and apply numbered labels to crates in sequence; crates are photographed and sealed on camera.
  5. Documentation handover: Deliver a single evidence pack (PDF + high‑res media + CNC files + DWTC RAMS and COIs) to exhibitors, insurers and logistic partners.

This workflow reduces insurer disputes because the insurer can verify chain‑of‑custody, pre‑dispatch condition and compliance before goods travel to DWTC.

Practical checklist & timeline for exhibitors (T‑60 to T‑0 days) — exhibit insurance Dubai

Use this timeline during the January–May mega‑cycle. Dates reference DWTC show windows; adjust per exhibitor calendar.

  • T‑60 days: Confirm booth footprint, submit preliminary shop drawings and request DCD material guidance. Book in‑house mock‑up slot with Burdak.
  • T‑45 days: Finalise BOM, obtain supplier DCD fire‑rating certificates and prepare serial lists for DG equipment (batteries, medical demo units).
  • T‑30 days: Complete full‑scale factory pre‑assembly and bench tests. Produce RAMS, engineered drawings and COIs. Generate photo and video evidence.
  • T‑14 days: Create serial‑matched ATA Carnet entries, compile MSDS/UN38.3 and final packing lists. Apply numbered crate labels and photograph sealed crates.
  • T‑7 to T‑0 days: Submit DWTC/ADNEC files (shop drawings, RAMS), hand the evidence pack to insurer and freight handler. Coordinate Official Freight Handler empty‑case storage instructions.

Templates we include

  • RAMS template: Scope, hazards, control measures, sequence of operations, competent personnel, emergency procedures.
  • Packing list template: Crate number, item description, serial numbers, weight, dimensions, handling marks, photos link.
  • Photo evidence checklist: Mock‑up overview, close‑ups of critical fixings, serial numbers, sealed crate images, bench test screenshots.
  • Insurer submission brief: Executive summary, evidence index, contact for technical queries, claim escalation steps.

FAQ — exhibit insurance Dubai

  • How much does a pre‑assembly evidence pack cost? Costs vary by scope; typical Burdak projects in the region offset venue surcharges (20–50%) and last‑mile premiums (10–30%) by preventing claims and remediation charges.
  • Are mock‑ups accepted by DWTC/ADNEC? Yes. Full‑scale pre‑assembly photos, stamped shop drawings and RAMS meet DWTC/ADNEC requirements when submitted within the 3–6 week window.
  • What about dangerous goods (batteries)? We produce UN38.3, MSDS documentation and serial‑matched ATA Carnet entries; items are bench‑tested and recorded to avoid customs holds.
  • Can this speed up insurer payouts? Yes. Factory‑stamped photographic evidence, BOMs and serial‑matched packing lists materially shorten dispute resolution and reduce contested deductions.
  • How does Burdak guarantee compliance? Our in‑house fabrication, CNC records and signed mock‑up checklists form a verifiable audit trail accepted by venues, insurers and freight handlers.

In tightly scheduled UAE mega‑cycles, prevention is the most cost‑effective risk control. We combine engineering, in‑house manufacturing and a disciplined evidence workflow so exhibitors get to showtime with compliant documentation, sealed crates and insurer‑grade proof — protecting budgets, schedules and reputations.